I seem to be revitalised and keen to get on with some constructive modelling although I've got to go to the hospital today. However, I've started on undertaking a little development on the layout. I've added a some details, basically a back wall, to the end building of demolition site at the front of the layout as I was a little concerned that the terrace end wall appeared very dangerous and unsupported, as well as some skips. I need to do a little more detailing here but compare with the pic above of the same scene taken from a similar viewpoint;

I've also cleared the off-scene area which will be the east end fiddle-yard and return loops. This is to enable planning and track laying. I've purchased some small flange head screws to hold down the track by clamping down on the sleeper ends. Here's a pic of the area although nothing is fixed. The two return loops are Peco radius 3 and 4 (11.75" and 13" - double that for a 4mm/OO equivalent). That's the largest radii for their setrack curves.


I've also cleared the off-scene area which will be the east end fiddle-yard and return loops. This is to enable planning and track laying. I've purchased some small flange head screws to hold down the track by clamping down on the sleeper ends. Here's a pic of the area although nothing is fixed. The two return loops are Peco radius 3 and 4 (11.75" and 13" - double that for a 4mm/OO equivalent). That's the largest radii for their setrack curves.















