Good news and bad. The good news is that the nickel silver etches are fine. Unfortunately a small drop off with part quantity on the brass etch means that modifications are essential. The upside to that is that some final tweaks are possible, so I am now confident that we will have an easy to build kit. Meanwhile I have been able to get on with the build.
Bit of a hybrid this one! Steampipes are not secured yet. So not too much left to do. Today's build was interrupted by having to get the gas fitter in to remove the gas fire in the lounge to release a pair of jackdaws that had investigated the chimney, proving that the cowl has failed. Tomorrow I'll be enjoying a trip on the S&C to deliver the B1. Thursday family duty so it looks like it will be the weekend before this is finished.
I need to add the remaining Caprotti castings and rods, ejector, injectors and associated plumbing, top feed, lubricators, hooter and then the backhead. Not too much really.
Now looking at the photos I wonder of the dome is central........... no it's not............