Here's a short update on a few things undertaken on the layout this weekend, although none are of any great consequence or dramatic effect. Not only did I need to order a single slip but I've also had to order a large radius curved right hand point. I've a few left hand ones but it's RH that is needed. That means no progress on the station throat trackwork.
However, I've effected a repair on the flat top tower crane and the New London Bridge House office block and I've fixed down the bridge over Boro High Street deck so it's smooth enough to continue to lay track to the west end return loops and fiddle-yard. I've also slightly adapted the crossover so that the left hand end is lightly curved to lead in to the angled platform lines.
And here's a pic taken today, just for the sake of it, of the through platforms.

However, I've effected a repair on the flat top tower crane and the New London Bridge House office block and I've fixed down the bridge over Boro High Street deck so it's smooth enough to continue to lay track to the west end return loops and fiddle-yard. I've also slightly adapted the crossover so that the left hand end is lightly curved to lead in to the angled platform lines.
And here's a pic taken today, just for the sake of it, of the through platforms.




