So this week we're back to the JLTRT King and working on the upper works, I've been here before so the odd niggle is easily worked out and progress is swift, three days basically for the footplate and cab to be virtually complete, valances, cab side sheet steps, lamp irons are outstanding.
The sanding levers will go on after paint and I'll box the top of the fire iron tunnel once the firebox is in place.
Sadly the blue lump is not suitable for our purposes, don't get me wrong it's lovely and as can be seen with no work it fits almost perfectly. However it's not heavy enough and even digging out the balsa wood core won't give enough capacity; but that aside the biggest problem is the slot for the ABC motor gearbox combo isn't going to cut it.
So it's out with the crayons, scissors and string to measure and make a new one front to back, to be honest the most time consuming aspect is punching all the rivets out on the smoke box wrapper and the rest will just drop into place. I could 3D the smoke box but by the time you've drawn it in CAD and then post processed it it's very much quicker to cut a new one from brass sheet and roll.
So let's see where we're at Friday evening....
